When is it time for a new roof?
Most roofs don't fail all at once. They get tired. The signs are repairs that keep coming back on different slopes, felt that has turned brittle along every eave, slates slipping all over the roof because the nails have rusted, or tiles that are flaking and porous. At that stage the covering, battens and underlay have reached the end of their life together, and spending money on patching each new leak stops making sense.
If you're not sure, ask us to look first. We'll photograph what we find and tell you honestly if a targeted repair or a restoration of the existing roof would do the job for less.
Rules to check before you re-roof
Building Regulations
Replacing a whole roof covering is controlled work. Planning Portal guidance says you will normally need building control approval once the work covers more than half of the roof, or more than a quarter of the building's whole outer envelope. Approval is also needed if the new covering is 15 per cent or more heavier than the old one, if its fire performance is very different, or if you alter the structure. A roof counts as a thermal element, so re-roofing usually means upgrading the insulation, to current standards where that is cost effective. Sign-off comes from building control or through a registered competent person scheme. Keep the certificate with your house papers, because buyers' solicitors ask for it.
Planning, listed buildings and the Bath World Heritage Site
Re-roofing that doesn't materially change how a house looks usually doesn't need planning permission. Changing the material, the roof shape or adding dormers is different. If you live in a conservation area, check with your council's planning team before you choose a new covering. If the house is listed, most changes to the roof will need listed building consent, and the Bath World Heritage Site brings extra controls.
Bats
Bats are protected by law, and government guidance lists repairing or replacing a roof as work that can affect them. Older roofs near open country and rivers can host roosts. If there is any sign of bats, a survey is needed before work starts, and Natural England can issue a licence where harm can't be avoided.
What re-roofing involves
- Survey and quote. We look at the covering, the timbers from inside the loft, the chimneys, the roofline and the access, then send a written quote listing materials and stages.
- Scaffolding. A full re-roof needs scaffold with edge protection on every working side.
- Strip-off. Old tiles or slates come off. Sound clay tiles and slates can be set aside for reuse where you want to keep the character.
- Timber check. With the roof open we inspect rafters, wall plates and any boarding, and show you photos of anything that needs replacing before we cover it up.
- Underlay and battens. A new membrane goes on, then new treated battens set to the gauge the chosen tile or slate needs.
- Covering and details. Tiles or slates are laid and fixed, with ridges, hips, verges, valleys and flashings finished to current standards.
- Insulation and ventilation. We complete the agreed insulation upgrade and make sure the roof space can still breathe.
- Clear-up and sign-off. Waste is taken away, the scaffold comes down and the paperwork is completed.
Choosing the new covering
For most Somerset homes the choice is between natural slate, clay tiles, concrete tiles and fibre cement slates, with flat sections over extensions or dormers. Our guide to tiles and slates for pitched roofs compares them. In short, we usually recommend matching what the house was built with, or what the street has, especially in a conservation area. A heavier covering than the original may need the structure checked.
Living with a re-roof
You can normally stay at home throughout. Expect noise, a scaffold around the house and a skip or waste bags on the drive. Clear the loft of anything precious, as dust falls when the old covering comes off. Weather can pause work, and we keep the roof covered at the end of each day.
Getting a quote for a new roof
To arrange a survey, phone 07933 861 087 or drop a line to hello@somersetroofing.co.uk. You can also book a free roof survey online. The survey has no call-out fee and the quote comes in writing, so you can compare it line by line.
New Roofs: common questions
Do I need Building Regulations approval for a new roof?
Usually, yes. Planning Portal guidance says approval is normally needed when work covers more than half of the roof or a quarter of the building's outer envelope, which a full re-roof always does. The insulation will generally need upgrading too. Work is signed off by a building control body, such as your council's, or through a competent person scheme, and you should keep the certificate for when you sell.
Can you reuse my old slates or clay tiles?
Often, in part. Natural slate and good clay tiles can outlast several sets of battens and underlay, so we sort them as they come off and keep the sound ones. Any shortfall is made up with matching reclaimed or new material, usually placed on less visible slopes. Concrete tiles and badly weathered tiles are rarely worth reusing. We'll show you photos so you can decide.
How long does a re-roof take?
It depends on the size of the roof, how many chimneys, valleys and dormers it has, whether timbers need replacing and, above all, the weather. A simple roof on a small house goes much faster than a large hipped roof with several chimneys. We give you a realistic plan with the quote and keep you updated if rain holds things up.
Will a new roof make my house warmer?
It can. Re-roofing over the Building Regulations threshold normally means upgrading insulation, either between and over the rafters or across the loft floor. Energy Saving Trust guidance recommends 270 mm of mineral wool for loft insulation laid at ceiling level. A sealed, dry roof also stops damp insulation losing its effectiveness. How much warmer your home feels depends on what was there before.
Do I need planning permission to change my roof tiles?
Like-for-like replacement usually doesn't. Changing to a noticeably different material or colour can, especially in a conservation area or if your council has made an Article 4 direction. For a listed building, most roof changes need listed building consent. If you are thinking of a different covering, check with your council's planning team before you commit.